Bridge Sveg Storön – Old meets New

We received a request from Sweco that they needed posts for a bridge in Sveg. The difficulty was that they were not allowed to rebuild the bridge, but had to use the old fasteners that you saw on the drawing and with different hole patterns. Thanks to our footplate construction, we were able to arrange this without too much re-engineering. Here, new technology had to be adapted to the old, and the bridge got posts that reduce the climate footprint.

Share this article on social media

Recommended articles